Volcano Bay Construction & Preview Discussion | Page 207 | Inside Universal Forums

Volcano Bay Construction & Preview Discussion

  • Signing up for a Premium Membership is a donation to help Inside Universal maintain costs and offers an ad-free experience on the forum. Learn more about it here.
Status
Not open for further replies.
oh and some more





I'm sure a few have noticed the large holes in the floor outside the main entrance 99% sure there are 10 and looking at the shape of the first steel parts set in the those holes I think we are safe to assume it is the sign for VB as seen in the recent images posted here that universal are using:

Untitled.jpg
 
Last edited:
That is the curious thing. At one point, the water coaster was going there and continue along the ramp until just beyond the volcano. So, in essence, they are adding even more capacity to the park with these slides. Uni ain't friggin around.

And there's still one expansion pad left. Bet we get something there in 2020 or so.
 
  • Like
Reactions: Mike S
Status
Not open for further replies.