Per Martin and Magic Feather on Magic, Stitch's Great Escape is set to close for a 3D Wreck it Ralph simulator to open in 2018 potentially. The ride will be similar to Minion Mayhem. Thoughts?
Definitely wrong location, we'll see about usage.Wrong use of the IP, and Wrong location for it.
"No Imagination Left"...A classic line......:ears::bored::cry::died::sick::sleep::stun:They no longer care about placement and theming. Sooner we stop expecting them to do what built the park experience the sooner the pain will end. IP du jour - just slam it in anyplace you can but be sure not to build anything new - that would add capacity and we can't have that.
Just sad, no wonder they don't need imagineers any longer, no imagination left
This is going to have more capacity than Stitch apparently, something that never has a wait outside of peak holidays. This is the equivalent of Twister to Fallon IMOThey no longer care about placement and theming. Sooner we stop expecting them to do what built the park experience the sooner the pain will end. IP du jour - just slam it in anyplace you can but be sure not to build anything new - that would add capacity and we can't have that.
Just sad, no wonder they don't need imagineers any longer, no imagination left
Not sure when construction started on Minions but T2 closed December of 2012 and Minions opened April of 2014I somehow doubt 18 months is enough time to gut and build for this. How long did the Minions into T2 take at USH?
Hey. Hey. HEY. Stitch is AWESOME. Just the rode sucks.I'm fine with this. I love Wreck-it Ralph, Stitch sucks, and it's a better property for Tomorrowland than Monsters Inc ever was.
it's a better property for Tomorrowland than Monsters Inc ever was.
Hey. Hey. HEY. Stitch is AWESOME. Just the rode sucks.
Sorry, meant the ride. Yes, the (original) movie is much better.
It'll take 12 months to get the chili dog smell out the building.I somehow doubt 18 months is enough time to gut and build for this. How long did the Minions into T2 take at USH?