Big empty box easy and fast to build.
But also, the same permits that say only 1 story now also deleted 150,000 sq ft previously, so not sure early info on there can be trusted.
EDIT: As in, permit a big 1 story empty box structure, then add interior structure later under separate interior build out permit (once they’re done actually designing it).